Problem:
– Single cell Series 9 wood cross flow had deteriorated and additional capacity was required.
Solution:
– Remove the existing tower and disposed from site.
– Brought all material up through the building and erected on existing support structure.
– Additional 400 tons was obtained with new design of tower on existing structure.
Project Details
CLIENT
Stockton Bush
PROJECT TYPE
Commercial
Time Frame
12 weeks