Alymer Ethanol

Alymer, Ontario

Problem:
– Original 3 cell tower built in 2008 by CTM.
– CTM was asked to build an additional cell to the tower to meet their
increased production requirements


Solution:
– Additionally, CTM supplied and installed another 4 cell pultruded fibreglass cooling tower to meet the needs of another site utilities plant

Project Details

CLIENT

Alymer Ethanol

PROJECT TYPE

Industrial

Time frame

10 weeks

Project Gallery

recently rebuilt field erected tower corner view with metal panels and louvers and fan
building an additional cell to a field erected tower, metal framing being erected
recently rebuilt field erected tower corner view with two technicians in a cherry picker working on the metal paneling of the louvers
adding an additional cell to a field erected tower, metal framing erected and drift eliminators installed
adding an additional cell to a field erected tower, metal framing erected and drift eliminators installed, technicians installing spray system
recently rebuilt field erected tower corner view with two technicians in a cherry picker working on the metal paneling of the louvers