Project Description
Enmax Calgary Energy Center
Calgary, Alberta
Problem:
– Recirculation line, 270 ft of 30” steel pipe at the base of the tower was becoming very rusty due to spillage from the Hot Water Basin above.
Solution:
– Wet sandblast pipe to control dust from blasting. Paint pop with 2 different Epoxy paints to eliminate rust ever happening again.
Project Details
CLIENT
Enmax
PROJECT TYPE
Commercial
Time Frame
2 weeks