Problem:
– Recirculation line, 270 ft of 30” steel pipe at the base of the tower was becoming very rusty due to spillage from the Hot Water Basin above.

Solution:
– Wet sandblast pipe to control dust from blasting. Paint pop with 2 different Epoxy paints to eliminate rust ever happening again.

Project Details

CLIENT

Enmax

PROJECT TYPE

Commercial

Time Frame

2 weeks

Project Gallery

industrial tower repair, painting the pipe below the louvers
industrial tower repair, the pipe below the louvers rusted, in the process of being painted
industrial tower repair, CTM technicians tarping over a section of the pipe and bottom two rows of louvers
industrial tower repair, section of the pipe below the louvers painted white
industrial tower repair, CTM technician painting the pipe below the louvers