First Canadian Place

Toronto, Ontario

  • Central Station Air Handler
  • Rack mounted humidification modules
  • Central Water Treatment Station

CTM is currently installing the 6th fan of an 8 year project at First Canadian Place. All C plant and B plant high pressure fans are being retrofitted with clean, efficient, ultrasonically produced mist. To date Brookfield has saved over $350,000 switching off the electric isothermal design in favour of the energy efficient ultrasonic.

Below is a video showing CTM’s Ultrasonic Humidification system installed directly inside an air handling unit on the 25th floor at First Canadian Place.

Project Details

CLIENT

First Canadian Place

PROJECT TYPE

Commercial

Time Frame

4 months per 3 cell tower (November – Feb) both towers