Problem:
– Old NC Series steel cross flow tower had reach life expectancy and had to be replaced.
– The steel framing had rusted and was structurally unsafe to operate.
– The mechanical assembly had failed and the heat transfer media was plugged reducing the capacity and efficiency of the tower.


Solution:
– Removed old unit from site and installed new steel cross flow unit c/w new piping, insulation and electrical connections.
– Old tower was craned out of position and dispose of from site.
– New tower was craned into position on new structural steel supports
– Removal, installation, piping, electrical and insulation were all carried out within the 1 week shut down period.

Project Details

CLIENT

Owens Corning

PROJECT TYPE

Commercial

Time Frame

1 week August shutdown

Project Gallery

New Marley packaged steel CrossFlow Cooling Tower, view of the exterior pipes, and ladder with safety cage
Plenum of an older tower with water rushing to the drain
New Marley packaged steel CrossFlow Cooling Tower partial view
New packaged steel CrossFlow Cooling Tower
rusting panel of an older package steel tower with dented piping
Side view of a new Marley package steel tower with new stainless steel piping
Cooling Tower Rusted Side