Project Description
Oxy Vinyl Canada
Thorold, Ontario
Problem:
– Existing 4 cell Marley Series 15 wood tower had deteriorated to a point of replacement.
Solution:
– Original plan was to replace the existing tower with a 4 cell pultruded fibreglass tower. However, CTM recommended replacing it with the Marley Everest Tower, a 3 cell stainless steel tower.
– The stainless steel option fit the existing footprint and the entire job was reduced from 3 months to 3 weeks.
– This 3 cell tower replaced the existing 4 cell wood cross flow tower because of the short turnaround on removal and installation. CTM was able to carry out the job during their planned shutdown and thus no interruption of production.
Project Details
CLIENT
Oxy Vinyl Canada
PROJECT TYPE
Industrial
Time Frame
3 Weeks