Project Description

Do You Have A Project We Can Help With?

GET A QUOTE

Oxy Vinyl Canada

Thorold, Ontario

Problem:
– Existing 4 cell Marley Series 15 wood tower had deteriorated to a point of replacement.

Solution:
– Original plan was to replace the existing tower with a 4 cell pultruded fibreglass tower. However, CTM recommended replacing it with the Marley Everest Tower, a 3 cell stainless steel tower.
– The stainless steel option fit the existing footprint and the entire job was
reduced from 3 months to 3 weeks.
– This 3 cell tower replaced the existing 4 cell wood cross flow tower because of the short turnaround on removal and installation. CTM was able to carry out the job during their planned shutdown and thus no interruption of production.

Project Details

CLIENT

Oxy Vinyl Canada

PROJECT TYPE

Industrial

Time Frame

3 Weeks

Project Gallery

field erected wood tower during demolition wood framing exposed
field erected wood tower during demolition wood framing exposed side view
field erected wood tower during demolition wood framing exposed side view with staris and platforms to the top
Cooling Tower basin and fill prior to installation
packaged steel crossflow tower side view of steel panels
packaged steel crossflow tower side view of steel panels with access door open
packaged steel crossflow tower side view of steel panels with access door open
packaged steel crossflow tower side view of steel panels